SUBSCRIBE
Tech Journal Now
  • Home
  • News
  • AI
  • Reviews
  • Guides
  • Best Buy
  • Software
  • Games
Reading: EV charging startup Electric Era raising fresh cash amid industry headwinds
Share
Tech Journal NowTech Journal Now
Font ResizerAa
  • News
  • Reviews
  • Guides
  • AI
  • Best Buy
  • Games
  • Software
Search
  • Home
  • News
  • AI
  • Reviews
  • Guides
  • Best Buy
  • Software
  • Games
Have an existing account? Sign In
Follow US
© Foxiz News Network. Ruby Design Company. All Rights Reserved.
Tech Journal Now > News > EV charging startup Electric Era raising fresh cash amid industry headwinds
News

EV charging startup Electric Era raising fresh cash amid industry headwinds

News Room
Last updated: August 22, 2025 5:02 pm
News Room
Share
5 Min Read
SHARE
Electric vehicles at an Electric Era fast charger installed at a Costco in Washington. (Electric Era Photo)

Seattle startup Electric Era is raising more cash to fund its DC fast-charging systems that include giant batteries to help deliver and store power. A filing with the U.S. Securities and Exchange Commission shows that the company has raised nearly $8.9 million in debt.

Startups raise capital via debt financing to help pay for operations without giving up equity. An Electric Era spokesperson declined to comment on the new funding.

Electric Era launched in 2019 and previously raised $20.5 million from investors. Last summer the business moved into a spacious, 18,000-square-foot facility located south of Seattle’s downtown.

This past June, Electric Era and Washington state officials celebrated the opening of an eight-port, electric vehicle charging system at an A1 Gas and Food off State Route 530, north of Seattle near the town of Arlington. The station was co-funded by the Washington Electric Vehicle Charging Program, which is supported by the state’s Climate Commitment Act.

The company is steadily deploying its charging stations across the U.S. despite efforts by the Trump administration and Republican lawmakers to curb the EV sector. President Trump took steps in February to halt the National Electric Vehicle Infrastructure program, but last week his administration issued new guidance to states eager to apply for $5 billion worth of NEVI grants.

The GOP’s “Big Beautiful Bill” ends tax credits after Sept. 30 for consumers purchasing EVs, and it eliminates a tax break for EV charging infrastructure by the end of next year.

RELATED: Seattle’s Electric Era deploys EV chargers at Costco after opening big, new HQ – take a look inside

Electric Era’s strategy is to pair its stations with existing businesses. It has installed chargers at a Costco in Ridgefield, Wash., mini-marts in Oregon, a shawarma shop outside of Boston, and locations in California, Florida, New Mexico, Kentucky, Delaware, Tennessee and Missouri. Dozens of additional sites are in the works according to the company’s station map.

CEO and co-founder Quincy Lee touts the speed at which Electric Era stations are built and installed, and their affordability and reliability.

  • It takes roughly six to eight months to deploy a station from the start of a project.
  • The systems are slightly more expensive than Tesla, but at least 25% cheaper than other competitors, Lee said in October.
  • Online, real-time tracking shows that the chargers are operational about 98% of the time. One of the challenges that have plagued other EV charging stations is how often they’re not functioning.

Fast-charging stations gulp electricity, but Electra Era’s inclusion of a battery storage system eliminates the need for new high-power grid connections for the chargers. It can also slash operating costs by up to 70%, the company reports, by drawing power from the batteries instead of the grid during times of high demand.

Each Electric Era charging device, which has ports for two vehicles, can deliver as much energy as is consumed by 200 homes. A typical station will have four chargers and serve about 150 cars per day.

Joe Nguyễn, director of the Washington State Department of Commerce, praised the Electric Era installation at the A1 Gas and Food site. Its opening was the first of 136 new public DC fast charger installations funded through the state’s program.

“This charging station is a result of collaboration between Washington state, private industry and local leaders to solve real-world challenges,” Nguyễn said in a statement. “It’s about cleaner air, stronger communities, and creating a more reliable EV experience for Washington drivers.”

Read the full article here

You Might Also Like

Microsoft will invest $30B in the U.K. by 2028 to fuel AI infrastructure and country’s largest supercomputer

Sirens, startups, and storytelling: My summer at GeekWire

Paid, a new AI agent billing startup led by Manny Medina, raises $21M seed from Lightspeed, FUSE, others

Geeks on deck: Startup leaders chat about favorite AI use cases, and their uniquely human strengths

Mitigating Certificate Risks To Strengthen Operational Resilience

Share This Article
Facebook Twitter Email Print
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -
Ad image

Trending Stories

Software

Computer mice can eavesdrop on private conversations, researchers discover

October 8, 2025
Games

All the playable clans in Vampire: The Masquerade – Bloodlines 2 and their clan abilities

October 8, 2025
Software

Apple’s DMA troubles in Europe continue, but a solution may be in sight – Computerworld

October 8, 2025
Games

Epic sues Fortnite botters who filled their own maps with clankers and made off with tens of thousands of dollars

October 8, 2025
Games

I cut out my tongue to unlock a door in Eclipsium, then things started getting weird

October 8, 2025
News

Fresh off $30M round, Seattle startup Lumen Bioscience adds Microsoft vet Jeff Raikes to board

October 8, 2025

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!

Follow US on Social Media

Facebook Youtube Steam Twitch Unity

2024 © Prices.com LLC. All Rights Reserved.

Tech Journal Now

Quick Links

  • Privacy Policy
  • Terms of use
  • For Advertisers
  • Contact
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?