SUBSCRIBE
Tech Journal Now
  • Home
  • News
  • AI
  • Reviews
  • Guides
  • Best Buy
  • Software
  • Games
Reading: Power shortages, carbon capture, and AI automation: What’s ahead for data centers in 2026
Share
Tech Journal NowTech Journal Now
Font ResizerAa
  • News
  • Reviews
  • Guides
  • AI
  • Best Buy
  • Games
  • Software
Search
  • Home
  • News
  • AI
  • Reviews
  • Guides
  • Best Buy
  • Software
  • Games
Have an existing account? Sign In
Follow US
© Foxiz News Network. Ruby Design Company. All Rights Reserved.
Tech Journal Now > AI > Power shortages, carbon capture, and AI automation: What’s ahead for data centers in 2026
AI

Power shortages, carbon capture, and AI automation: What’s ahead for data centers in 2026

News Room
Last updated: January 27, 2026 8:43 pm
News Room
Share
2 Min Read
SHARE

“Despite a broader use of AI tools in enterprises and by consumers, that does not mean that AI compute, AI infrastructure in general, will be more evenly spread out,” said Daniel Bizo, research director at Uptime Institute, during the webinar. “The concentration of AI compute infrastructure is only increasing in the coming years.”

For enterprises, the infrastructure investment remains relatively modest, Uptime Institute found. Enterprises will limit investment to inference and only some training, and inference workloads don’t require dramatic capacity increases.

“Our prediction, our observation, was that the concentration of AI compute infrastructure is only increasing in the coming years by a couple of points. By the end of this year, 2026, we are projecting that around 10 gigawatts of new IT load will have been added to the global data center world, specifically to run generative AI workloads and adjacent workloads, but definitely centered on generative AI,” Bizo said. “This means these 10 gigawatts or so load, we are talking about anywhere between 13 to 15 million GPUs and accelerators deployed globally. We are anticipating that a majority of these are and will be deployed in supercomputing style.”

2. Developers will not outrun the power shortage

The most pressing challenge facing the industry, according to Uptime, is that data centers can be built in less than three years, but power generation takes much longer.

“It takes three to six years to deploy a solar or wind farm, around six years for a combined-cycle gas turbine plant, and even optimistically, it probably takes more than 10 years to deploy a conventional nuclear power plant,” said Max Smolaks, research analyst at Uptime Institute.

This mismatch was manageable when data centers were smaller and growth was predictable, the report notes. But with projects now measured in tens and sometimes hundreds of megawatts, finding that much power quickly has become nearly impossible.

Read the full article here

You Might Also Like

Apple’s Siri to see two major AI improvements this year – Computerworld

HP’s new computer is built into the keyboard – Computerworld

The best Android feature you (probably) aren’t using – Computerworld

Will Google get smart glasses right this time? – Computerworld

Who profits from AI? Not OpenAI, says think tank – Computerworld

Share This Article
Facebook Twitter Email Print
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

- Advertisement -
Ad image

Trending Stories

Games

Anime action RPG studio Pahdo Labs shuts down despite accruing $17.5M in funding: ‘We believed making a demo of a familiar but new game would be our best shot’

February 4, 2026
News

Tech Moves: Tableau CEO steps down; Microsoft taps new executive VPs; Avanade’s new CEO

February 4, 2026
Games

Good news, Stardew Valley enthusiasts: the 1.7 update will make children ‘a little more interesting’ and add two new marriage candidates

February 4, 2026
News

Washington’s ‘millionaires tax’ targets top earners as tech leaders warn of startup fallout

February 4, 2026
Games

As a Sims 4 Build Mode freak, today’s free update is way more important than the new expansion

February 4, 2026
Games

Why does isometric perspective suit Disco Elysium? ‘You can design the entire game as if it was a painting’

February 4, 2026

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!

Follow US on Social Media

Facebook Youtube Steam Twitch Unity

2024 © Prices.com LLC. All Rights Reserved.

Tech Journal Now

Quick Links

  • Privacy Policy
  • Terms of use
  • For Advertisers
  • Contact
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?