Tech Journal NowTech Journal Now
Font ResizerAa
  • News
  • Reviews
  • Guides
  • AI
  • Best Buy
  • Games
  • Software
Search
  • Home
  • News
  • AI
  • Reviews
  • Guides
  • Best Buy
  • Software
  • Games
  • More Articles
Have an existing account? Sign In
Follow US
© Foxiz News Network. Ruby Design Company. All Rights Reserved.
Tech Journal Now > News > With a headcount topping 800, Helion opens Seattle office in pursuit of fusion energy – GeekWire
News

With a headcount topping 800, Helion opens Seattle office in pursuit of fusion energy – GeekWire

News Room
Last updated: September 9, 2026 3:59 am
News Room
Share
5 Min Read
SHARE

by Lisa Stiffler on Sep 8, 2026 at 6:08 pmSeptember 8, 2026 at 6:08 pm

Helion Energy’s new Seattle office. (Helion Photo)

Helion Energy, in its hard-charging pursuit of fusion energy, has opened an office in downtown Seattle as its headcount swells to 800 employees.

The company already occupies five buildings in Everett, Wash., where it’s headquartered, plus operations in the central Washington town of Malaga, where Helion is building what it hopes could be the world’s first commercial fusion plant.

“Who would have thought it when we founded the company in 2013 with only five of us,” said CEO and co-founder David Kirtley in a GeekWire interview, marveling at the growth.

In June, Helion announced $465 million in new funding, bringing its total capital raised to more than $1.5 billion and its valuation to 10 times that figure.

The company is racing to master fusion, which produces energy by smashing together light atoms — essentially replicating the process that powers the sun and stars. No one has been able to create a commercially viable amount of energy from fusion here on Earth, though notable progress is being made by research institutions and private companies.

The planet is increasingly hungry for abundant, clean power as data centers gobble energy and transportation, buildings and industrial processes shift toward electrification.

That has helped spike interest in fusion, and the sector globally has raised $14.24 billion since 2021, according to the Fusion Industry Association, with multiple companies predicting they’ll succeed in producing sufficient energy in the next five to 10 years. Helion has one of the most ambitious targets, aiming to reach that mark in two years.

The company is No. 1 on the GeekWire 200, a ranked index of the Pacific Northwest’s top startups.

#1

Renewable Energy Power Generation • Everett, Washington

Inside Helion’s new Seattle offices. (Helion Photo)

The company’s Seattle office is 15,631 square feet in the 8th + Olive building, in a space formerly occupied by Airbnb. The move comes as Seattle pushes to bring businesses back into its core: The city’s urban neighborhoods had an office vacancy rate of 28.2% in the second quarter of this year, with downtown alone at 34.9%, according to Kidder Mathews research.

Kirtley said they’re hiring and the goal is to have 100 employees downtown working on business and operations, recruiting and finance.

Related


Inside the race to power AI data centers with fusion energy — and the surprise detours along the way

Back in Everett, teams are running tests on the company’s prototype fusion device, named Polaris, and working to get a smaller fusion machine called Tiny Merge online. The startup is also ramping up a facility for assembly work where employees and automated systems will manufacture energy-carrying capacitors, semiconductor modules and other hardware. The facility is currently producing initial test pieces.

The Malaga site will be home to the Orion facility and will include three buildings: an office building, already complete and in use; a building for final assembly of components shipped from Everett, also finished; and the generator building, which will house the 50-megawatt Orion generator and associated power electronics. So far the beams are up for the last building, with the goal of getting it “weather tight” before winter, Kirtley said.

Helion is charging ahead with Orion and building its manufacturing capabilities while continuing to tackle the physics challenges of producing energy from fusion.

The plant must be operational in two years to meet Helion’s contract with Microsoft to provide energy for a nearby data center.

Read the full article here

You Might Also Like

AWS government tech VP departs; Funko, Coinme and DAT Freight add to C-suite – GeekWire

Amazon eyes ‘fully automated’ delivery stations to bring robotics to the last mile – GeekWire

AWS is ‘booming,’ but Amazon’s free cash flow turns negative on record AI spending – GeekWire

Amazon expands Locker package pickup to more than 750 U.S. college locations – GeekWire

Rules to Protect Kids From AI Risk Repeating Social Media Mistakes

Share This Article
Facebook Twitter Email Print
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?